Buroh Connection: What’s New
Buroh Connection Availability — Coming Soon
The units open for selection will be listed here once the release begins. Last updated .
Registration for Buroh Connection is open. Soilbuild’s new Business 2 development at Jalan Buroh is being prepared for release, and registered parties receive the full project details, the e-brochure and the floor plans and specifications first.
The price list, the units open for selection and the first showflat appointments follow in the same order, through the Sales Concierge.
Registered parties receive
- Full project details and the e-brochure, sent on the day of issue.
- Floor plans and specifications for every unit type.
- Indicative pricing with the price list, and the first viewing slots.
Buroh Connection timeline
- Now. Registration open for Buroh Connection; e-brochure, floor plans and indicative pricing go to registered parties first.
- 31 March 2026. JTC launches the Jalan Buroh site, the first of six Confirmed List sites in the first-half 2026 industrial land sales programme.
- 9 June 2026. The tender closes with three bids.
- 17 July 2026. JTC awards the site to Soilbuild Group Holdings Ltd for $214,440,119.
- 31 July 2026. LTA announces Cross Island Line Phase 3, with an interchange at Jurong Pier station.
- 2029. Jurong Pier station on the Jurong Region Line expected to open (LTA).
The site’s project completion period, set by JTC, runs 84 months from the July 2026 award, and the Jurong Region Line is expected to reach Jurong Pier in 2029, well within that window.
The project details page follows each step of the release as it happens.
Buroh Connection at a Glance
Buroh Connection is the industrial development Soilbuild Group Holdings Ltd is bringing to Jalan Buroh, on a 31,151.5 square-metre JTC site in the west of Singapore. The land is zoned Business 2, the zone for general industry, and it is held on a 33-year lease with strata subdivision allowed.
That combination is the heart of the offer: a B2 address where a business can own its premises outright for the length of the lease, on a site large enough for a gross floor area of about 77,879 square metres at its maximum plot ratio of 2.5.
The site sits on Jalan Buroh close to its junction with Jurong Pier Road. The Jurong Region Line, Singapore’s first fully elevated MRT line, will stop at Jurong Pier station at that junction, about 240 m away, with the station expected to open in 2029.
The Ayer Rajah Expressway is reached along Jurong Pier Road and Jalan Ahmad Ibrahim, the Jurong Island Checkpoint lies just south, and Jurong Port is about 1.1 km away to the east, so goods, staff and visitors all have direct routes in and out.
JTC launched the site on 31 March 2026 and awarded it to Soilbuild on 17 July 2026 after a three-way tender. The project details page sets out every planning parameter, and the developer page follows Soilbuild’s record in business space.
Buroh Connection Location

Buroh Connection occupies a 31,151.5 square-metre parcel on Jalan Buroh, the road that runs along the southern edge of Jurong close to the sea. The site lies near the point where Jalan Buroh meets Jurong Pier Road, one of the main roads of the industrial west, and it falls within District 22.
For a business, location is measured in distance to customers, suppliers, staff and the expressway. Jalan Buroh scores on each count: the rail line arriving at the corner, the port and island next door, and a direct road to the Ayer Rajah Expressway.
Jurong Pier station at the junction
The Jurong Region Line will end its main southern branch at Jurong Pier station (JS12), built over Jurong Pier Road at its junction with Jalan Buroh. The station is about 240 m away, so staff and visitors will be able to arrive by train.
LTA expects Jurong Pier and the other stations of Stage 3 to open in 2029. The line itself is Singapore’s first fully elevated MRT line, 24 kilometres long with 25 stations, running driverless three-car trains that can grow to four cars.
Three interchanges across the west
Along its route the Jurong Region Line meets the existing network at Choa Chu Kang, Boon Lay and Jurong East. A worker living in the north-west, in the western towns or around the Jurong East regional centre can reach Jalan Buroh with a single change, rather than the bus journeys the area relies on today.
Jurong Hill station (JS11), the stop before Jurong Pier, is about 550 m away. Boon Lay and Pioneer stations on the East-West Line are about 2.7 km and about 2.9 km away, and both are named in JTC’s brief for the site.
From the platform to the city
A change at Jurong East puts the North-South and East-West Lines within reach, and a change at Boon Lay the rest of the East-West Line towards Tuas. Until the new line opens, Boon Lay, Pioneer and Joo Koon stations, about 2.7 km, 2.9 km and 3.7 km away, are the rail links JTC’s brief names for the site, and the Jurong East regional centre is about 4.4 km away.
Cross Island Line Phase 3
On 31 July 2026 LTA announced the third phase of the Cross Island Line, about 10 kilometres long with four stations. Its station CR21 will interchange with the Jurong Region Line at JS12, the Jurong Pier station, linking the site towards Jurong Lake District to the east and Gul Circle to the west. Construction is expected to start in 2027, with the stations targeted to open by the late 2030s.
Expressway, port and island
For vehicles, JTC’s brief points to the Ayer Rajah Expressway by way of Jalan Ahmad Ibrahim and the arterial roads around the site. Jurong Pier Road runs north from the junction to the AYE, so lorries and vans move between Jalan Buroh and the rest of the island without crossing a town centre.
The Jurong Island Checkpoint, gateway to the island’s chemical and energy cluster, lies about 590 m away, with Jurong Port’s office on Jurong Port Road about 1.1 km away. The Tuas Second Link, which JTC’s brief lists for its direct route to Malaysia, is about 8.9 km away at the Tuas Checkpoint.
A wider area to hire from
For an employer, a station about 240 m away widens the area staff can travel from. Once the line is open, anyone living near a Jurong Region Line station, from Choa Chu Kang and Tengah to Boon Lay and Jurong East, reaches Jurong Pier station by rail, about 240 m away.
The western industrial heartland
Jurong is where Singapore’s industrial estates began, and the land around Jalan Buroh remains working industrial ground. A B2 site here sits among the trades and suppliers a production or servicing business deals with every day, rather than among offices and shops.
The location page sets out every distance in detail, and the map further down this page shows the site against the junction and the station.
Buroh Connection Developer

Buroh Connection is developed by Soilbuild Group Holdings Ltd, which won the Jalan Buroh site in JTC’s 2026 industrial land tender. Soilbuild is an integrated property group with over 48 years of experience, organised around three pillars: building, developing and managing property.
Three bids, one award
The Jalan Buroh tender drew three bids. Soilbuild’s offer of $214,440,119 was the highest, equal to $2,753.51 per square metre of gross floor area, and JTC awarded the site to Soilbuild Group Holdings Ltd on 17 July 2026. JTC’s record of bids lists the two other offers at $180,230,000 and $178,880,000.
Build, develop and manage
Soilbuild’s business spans construction, development and the management of completed buildings, covering both residential projects and business space. Its construction arm, Soil-Build (Pte.) Ltd., is registered with the Building and Construction Authority for general building and civil engineering work, so the group can carry a project from design and construction through to managing it once occupied.
The group also works with JTC under the Developer Partnerships Programme, which uses design, build and lease or sell schemes to deliver industrial space, and it has extended its business to Vietnam and Myanmar.
Its construction and property-services teams list certifications under ISO 9001 for quality, ISO 14001 for environmental management and OHSAS 18001 for occupational safety, and the construction arm was certified under BCA’s Green and Gracious Builder scheme in 2013, 2014 and 2015, with a Merit award in 2016.
How the tender unfolded
JTC put the Jalan Buroh parcel up for tender on 31 March 2026, the first of six Confirmed List sites in the first half of the year. The tender closed on 9 June 2026, JTC published the three bids the next day, and the award to Soilbuild followed on 17 July 2026, about five weeks after the close.
The winning bid was about 19% above the next-highest offer, a measure of the value Soilbuild placed on a large, strata-ready B2 site at the southern end of the Jurong Region Line.
A long run of JTC land wins
Jalan Buroh is the latest in a series of industrial sites Soilbuild has won from JTC. JTC’s own award notices record Soilbuild as the successful tenderer for Corporation Drive in October 2018, Gambas Way (Plot 2) in June 2019, Tampines North Drive 4 (Plot 1) in November 2023 and Lok Yang Way in November 2024, among others.
Soilbuild’s current sale list spans the island, from Lok Yang Connection and West Spring in the west to Tampines Connection in the east and B-Central, two seven-storey flatted factory blocks in Bendemeer, alongside the Liner production units and the Food Ascent industrial development.
The group’s residential work runs alongside its business space. Its current sale list also includes Hillock Green, a residential development of 474 units in three 23-storey towers, showing the same build-and-develop model applied to homes.
Recognised for design
Among the honours Soilbuild lists, its Solaris development received FIABCI-Singapore and FIABCI World Prix d’Excellence awards and BCA Green Mark Platinum awards in 2015 and 2016, and the Church of St Mary of the Angels, a Soilbuild project, was named Design of the Year at the 2006 President’s Design Award.
Corporate recognition has followed the projects: the Securities Investors Association (Singapore) named Soilbuild among its most transparent companies in 2014 and 2015, the group’s board received a bronze award for Best Managed Board at the Singapore Corporate Awards in 2017, and in 2024 and 2025 the group and its construction arm were recognised as Champions of Good in the Company of Good programme.
Why it matters at Jalan Buroh
An owner-occupier buying a strata unit is buying into a building it will run its business from for years. A developer that designs, builds and manages its own business space brings the same team from the drawing board to handover, which is what Soilbuild offers at Buroh Connection.
The developer page sets out the JTC record in full, with the land tender and its documents.
Buroh Connection Showflat Appointment

Viewing a new industrial development is about more than finishes. A business owner wants to see how a unit would take its machines, its racking or its benches, how goods would move from the loading area to the door, and how staff and guests would arrive. A showflat appointment at Buroh Connection is arranged to answer exactly those questions.
By appointment through the Sales Concierge
Showflat viewings are arranged by appointment through the Sales Concierge. Appointments are held one party at a time, so each visit can focus on the operation the unit has to serve, from the layout of the work floor to the space set aside for an office.
Registered parties are offered the first appointments once viewings open, ahead of any wider release. Registering now through the form on this page, or by calling or sending a WhatsApp message to 6200 6220, places your name on that list.
What a registered party receives first
Before the appointment, the Sales Concierge passes on the e-brochure, floor plans and specifications as each one is released, together with the price list and the units available to choose from. Reading them beforehand turns the appointment into a working session rather than a first look.
The floor plan page and the e-brochure page will carry the documents for download once they are released, and registered parties receive them directly by email on the day.
Bring your requirements
Businesses buying industrial space usually arrive with a list: the trade the unit is for, the equipment it must hold, the number of staff and the deliveries it handles. Sharing those details at registration lets the Sales Concierge point you to the unit types that suit the operation once they are released.
A short note on any of the following is enough to start: the activity carried on in the unit, the heaviest item of equipment, how goods arrive and leave, how many people work on site, and how much office space the team needs within the 40% supporting allowance.
Reading the specifications together
Once the floor plans and specifications are issued, the appointment is the place to go through them line by line against your operation, with the Sales Concierge on hand to take any question back to the developer’s team. Registered parties receive the documents first, so they arrive ready.
Owner-occupiers and investors
Some buyers will occupy their unit; others will lease it to an industrial tenant. Both are welcome to book a showflat appointment, and the Sales Concierge can explain the B2 use rules that apply to each, together with the cost of a purchase worked out in the industrial purchase calculator.
After the appointment
When a unit is chosen, the purchase begins with the option to purchase and the eight-week sale and purchase period, during which the first 20% of the price is paid with GST and Buyer’s Stamp Duty. Arranging the bank loan and deciding whether to buy in a company name before the appointment keeps that period straightforward.
Who to bring
The people who will run the unit see what a plan cannot show: how a machine would be brought in, where a workbench would stand, how a pallet would move from the loading area to the racking. Bringing them to the appointment, alongside the decision-maker, makes the visit count.
One party at a time
Each appointment is held for a single party, so a business can bring the people who will run the unit, such as an operations manager or a production lead, and spend the time on the questions that matter to its own work.
Before you visit
The stamp duty and GST page, the payment scheme page and the industrial loan page set out how an industrial purchase is taxed and paid for, so the showflat appointment can stay focused on the unit itself.
The showflat appointment page takes a registration directly, with your preferred day and time.
Buroh Connection Location Map
Address
Buroh Connection, Jalan Buroh, near the junction with Jurong Pier Road, Jurong, Singapore (District 22).
Nearest MRT
Jurong Pier station (JS12) on the Jurong Region Line, expected to open in 2029, about 240 m away.
Key distances
Straight-line distances from the site, measured on map coordinates; walking routes are longer.
Why Buroh Connection Stands Out in Jurong
The qualities that set Buroh Connection apart, each drawn from JTC, URA and LTA records. Together they describe a site chosen for working businesses: the right zoning, ownership on JTC land, and connections by rail, road and sea within a short distance of the gate.
- A true B2 address. Business 2 is URA’s zone for general industry, the home of manufacturing, production, assembly and repair work.
- Strata ownership on JTC land. Strata subdivision is allowed, so businesses can own their own unit for the 33-year lease rather than renting.
- A station at the corner. Jurong Pier station on the Jurong Region Line sits about 240 m away, with LTA expecting it to open in 2029.
- A future interchange. LTA plans Cross Island Line Phase 3 to meet the Jurong Region Line at Jurong Pier, with stations targeted for the late 2030s.
- Port, island and expressway. Jurong Port, the Jurong Island Checkpoint and the Ayer Rajah Expressway are all close by road.
- Built by an industrial specialist. Soilbuild builds, develops and manages business space, and won this site against two other bidders.
The JTC Land Tender Behind Buroh Connection
The land beneath Buroh Connection was released by JTC as part of the Industrial Government Land Sales Programme for the first half of 2026, as the first of that half’s six Confirmed List sites. A Confirmed List site is put up for tender on a set date, whatever the level of interest, so the release of Jalan Buroh followed the published programme.
JTC launched the tender on 31 March 2026 and it closed on 9 June 2026. JTC received three bids and, on 17 July 2026, awarded the land to Soilbuild Group Holdings Ltd for $214,440,119.
What the land figures say
JTC records the winning bid as $2,753.51 per square metre of gross floor area at the maximum plot ratio, which works out to about $256 per square foot per plot ratio. At a gross plot ratio of 2.5 on 31,151.5 square metres, the maximum gross floor area is about 77,879 square metres; the minimum plot ratio of 2.0 sets a floor of about 62,303 square metres.
The rest of the tender field
JTC’s record of bids lists the other two offers at $180,230,000, equal to $2,314.24 per square metre of gross floor area, and $178,880,000, equal to $2,296.90. Soilbuild’s winning bid was about 19% above the second.
The conditions that shape the development
The site carries a maximum height of 85 metres above the Singapore Height Datum and a project completion period of 84 months from the award. Strata subdivision is allowed, which is what lets the finished building be sold unit by unit.
The tender brief, published by JTC with the site plan, location plan and technical conditions, is the primary record of the land:
JTC Tender Brief: Jalan Buroh (PDF) (PDF, jtc.gov.sg)
The planning parameters, tender dates and transport links for the Jalan Buroh parcel, as issued by JTC.
Source of the land figures: JTC. The per-square-foot figure is converted from JTC’s per-square-metre rate.
What Business 2 Zoning Means at Buroh Connection

URA divides industrial land into two business zones. Clean and light industries belong in Business 1; general and special industries are placed in Business 2. Buroh Connection is a Business 2 site, the zone planned for heavier and more varied industrial work.
Why B2 sits in industrial districts
URA notes that NEA requires a nuisance buffer of 100 metres between a Business 2 zone and the land around it. That is why B2 sites are grouped within established industrial areas, such as the stretch of Jurong around Jalan Buroh, where the neighbours are other workshops, yards and plants, and where heavier work sits comfortably.
The 60:40 rule
In a B2 development at least 60% of the total gross floor area is used for industrial purposes, and the remaining 40% at most may serve supporting uses. In a strata-subdivided building the same split applies inside every unit, so each owner keeps at least 60% of the unit for the industrial activity itself.
The predominant uses
URA’s list of predominant uses for Business 2 covers manufacturing as general industry, repair and servicing, production, assembly, knitting mills, core media production and industrial training, together with e-business activities that count as industrial use, such as telecommunications and software development.
Storage of chemicals and oils also appears in the list, and URA notes that warehouses are among the industrial developments allowed on Business 1 and Business 2 land.
The supporting uses
Within the 40%, a unit can hold an ancillary office, a meeting room, a sick room and the M&E services the operation needs, and a development can provide an industrial canteen for the people who work there. Showrooms are considered on the first storey through a change-of-use application once the building has its Temporary Occupation Permit and the operator is known.
Multi-user rules
URA distinguishes a single-user development, which cannot be strata subdivided, from a multi-user one, which can. Because JTC allows strata subdivision at Jalan Buroh, the development can be offered as individual units, with the 60:40 split applied both across the building and inside each unit. Common areas such as corridors, lifts, staircases and plant rooms sit within the development’s supporting quantum.
Canteens, displays and other supporting space
An industrial canteen may include food stalls or a cafeteria that mainly serves the people working in the estate. URA caps it at 700 square metres or 5% of the proposed gross floor area, whichever is lower. An ancillary display area may show the products of the industrial operation it sits within, though goods are not sold from it. Call centres, which URA places in Business 1 and business parks, are not among the B2 uses.
What the zoning means for a buyer
For an owner-occupier, Business 2 answers the first question of any industrial purchase: whether the work can be done on the premises. For an investor, it defines the tenants a unit can serve. Either way, the zoning stays with the land for the full 33-year lease, so the rules described here are the ones every owner at Buroh Connection works within. The Sales Concierge can go through them with you against your own operation before you choose a unit.
Approvals for each operation
URA evaluates any use that its list does not name on the merits of the case, and every operator’s use is assessed against URA’s guidelines and the conditions JTC set for the Jalan Buroh land. The project details page sets out those land conditions, and the B1 or B2 guide explains how the two zones differ.
Possible Uses at Buroh Connection
The pictures below are illustrative fit-outs, showing the kinds of industrial work a Business 2 unit is planned for. They show how a unit might be laid out for each trade; the people in them are illustrative staff, not occupiers of Buroh Connection.
Artist’s impression, illustrative only
Artist’s impression, illustrative only
Artist’s impression, illustrative onlyEach fit-out matches a category in URA’s Business 2 guidelines: manufacturing for the machining workshop, warehousing for the fulfilment floor and assembly for the electronics bench. Whether a particular business can operate in a unit is decided case by case, against URA’s rules and JTC’s conditions for the land.
For an investor, the same categories describe the tenants a unit can be leased to: industrial occupiers whose work fits Business 2, from engineering firms to assemblers and fulfilment operators.
The guide to the businesses that can operate at Buroh Connection goes through the categories one by one, and the Sales Concierge can check a specific trade with you at registration.
Getting to Buroh Connection
Rail is the change that matters most at Buroh Connection. Today the nearest stations are on the East-West Line, several kilometres inland; from 2029, LTA expects the Jurong Region Line to stop at the junction beside the site.
Swipe sideways to see the full table
| Station | Line | From the site | Note |
|---|---|---|---|
| Jurong Pier (JS12) | Jurong Region Line | about 240 m | expected 2029; future interchange with the Cross Island Line |
| Jurong Hill (JS11) | Jurong Region Line | about 550 m | expected 2029 |
| Boon Lay (EW27) | East-West Line, future JRL interchange | about 2.7 km | named in JTC’s brief |
| Pioneer (EW28) | East-West Line | about 2.9 km | named in JTC’s brief |
| Joo Koon (EW29) | East-West Line | about 3.7 km | named in JTC’s brief |
| Jurong East (EW24 / NS1) | East-West and North-South Lines, future JRL interchange | about 4.3 km | regional centre |
Straight-line distances from the site, measured on map coordinates. Opening years are LTA’s.
The Jurong Region Line in brief
The line runs 24 kilometres through the west with 25 stations, opening in stages from 2028. Stage 3 in 2029 extends the main branch south to Jurong Pier and west into NTU, adding seven stations. Trains are fully automated, and the line is built entirely on viaducts.
Cross Island Line Phase 3
Jurong Pier is planned to become an interchange. On 31 July 2026 LTA set out the route of Cross Island Line Phase 3, about 10 kilometres with four stations from Jurong Lake District to Gul Circle, with station CR21 connecting to the Jurong Region Line at JS12. Stations are targeted to open by the late 2030s.
Roads and the border
For vehicles, Jurong Pier Road leads north to the Ayer Rajah Expressway, and Jalan Ahmad Ibrahim, one of the main roads through the western estates, is close by. The Tuas Second Link to Malaysia, which JTC’s brief lists among the site’s connections, starts at the Tuas Checkpoint about 8.9 km away.
Next door: Jurong Island and Jurong Port
The Jurong Island Checkpoint lies about 590 m away and Jurong Port’s office on Jurong Port Road about 1.1 km away. For a supplier serving the island’s plants or a business handling sea freight, those are short, direct trips.
The regional centre
Jurong East, the regional centre where JEM stands beside the MRT station, lies about 4.4 km away. Once the Jurong Region Line is complete, it will be reachable by rail from Jurong Pier with a change of line, putting banks, meeting venues and restaurants within easy reach of a working day at Jalan Buroh.
The location page and the transport and logistics guide go into each connection.
Buying an Industrial Unit at Buroh Connection
Stamp duty
Buyer’s Stamp Duty on industrial property follows the non-residential bands: 1% on the first $180,000, then 2%, 3% and 4% on the next $180,000, $640,000 and $500,000 respectively, and 5% above $1.5 million. No Additional Buyer’s Stamp Duty applies to industrial property.
If an industrial unit is resold within three years, Seller’s Stamp Duty is due at 15% in year one, 10% in year two and 5% in year three. The stamp duty and GST page covers both in full, and the stamp duty calculator works out the figure for any price.
GST
The sale of a new industrial unit by a GST-registered developer carries GST at 9% on the price. A buyer registered for GST and using the unit for taxable business supplies can generally claim it back as input tax. GST is billed with each instalment, so the cash plan includes it at every stage, even where the instalment itself is funded by a loan.
No CPF, cash and loan only
CPF savings cannot be used for industrial property, so the first 20%, the GST and the stamp duty come from your own funds, and the balance from a bank loan drawn as the building rises.
Financing
Bank loans for industrial property fall under MAS’s Total Debt Servicing Ratio of 55%, and lenders test repayments at the higher of 5% a year or the loan’s actual rate for non-residential property. The industrial loan page explains how banks assess a company or an individual buyer.
Paying in stages
A unit bought during construction is paid for in stages as the building rises. The payment scheme page walks through each stage, and the industrial purchase calculator sets out the cash, GST, duty and loan for any price you enter.
Who can buy
Industrial units sit outside the residential rules on foreign ownership, so individuals and companies, local or foreign, can buy, and no Additional Buyer’s Stamp Duty applies. Many buyers use a company, which banks often prefer for B2 property. The guide to foreign and company buyers explains the position.
Ownership under a JTC lease
Each strata unit is held for the remainder of the 33-year JTC lease. The guide to the 33-year lease sets out what that tenure means for owners.
Register for Buroh Connection
Buroh Connection is Soilbuild’s new Business 2 development at Jalan Buroh. Registered parties hear first as each part of the release is issued, from the e-brochure and floor plans to the price list and the first viewing appointments.
Released to registered parties first
- The e-brochure and the floor plans and specifications, on the day they are issued.
- The price list with the units open for selection.
- A showflat appointment held in your name once viewings open.
Register for Buroh Connection
The Sales Concierge answers every registration personally.
For a direct word with the Sales Concierge, call or WhatsApp 6200 6220.
Buroh Connection Frequently Asked Questions
What is Buroh Connection?
Buroh Connection is a new Business 2 (B2) industrial development by Soilbuild Group Holdings Ltd at Jalan Buroh in Jurong. It stands on a 31,151.5 square-metre site that JTC awarded to Soilbuild on 17 July 2026 under the Industrial Government Land Sales Programme, and the site allows strata subdivision, so units can be sold individually to businesses and investors.
Where is Buroh Connection located?
Buroh Connection is on Jalan Buroh near its junction with Jurong Pier Road, in Jurong, District 22, in the west of Singapore. The Jurong Pier station of the Jurong Region Line is about 240 m away, and the Jurong Island Checkpoint about 590 m.
Who is the developer of Buroh Connection?
Soilbuild Group Holdings Ltd is the developer, a Singapore group with more than four decades of business-space projects to its name. Soilbuild won the Jalan Buroh tender with the highest of three bids, at $214,440,119.
What is the tenure of Buroh Connection?
JTC granted the Jalan Buroh land on a 33-year lease, the tenure fixed for this site in its 2026 industrial land sales programme.
What is the zoning of Buroh Connection?
Its zoning is Business 2 (B2), which URA designates for general and special industry. URA requires a B2 development, and each strata unit in it, to give at least 60% of its floor area to industrial work, leaving up to 40% for supporting uses like offices and meeting rooms.
Which MRT station is nearest to Buroh Connection?
Jurong Pier station (JS12) on the Jurong Region Line, which LTA expects to open in 2029, sits at the junction of Jurong Pier Road and Jalan Buroh, about 240 m away. Jurong Hill station (JS11) is the next stop north, about 550 m away.
How large is the Buroh Connection site?
The site measures 31,151.5 square metres, about 3.12 hectares. With a gross plot ratio of 2.0 to 2.5, the maximum gross floor area is about 77,879 square metres, and buildings may rise to 85 metres above the Singapore Height Datum.
When was the Buroh Connection land tender awarded?
JTC launched the Jalan Buroh tender on 31 March 2026 and closed it on 9 June 2026 with three bids. The site was awarded to Soilbuild Group Holdings Ltd on 17 July 2026 for $214,440,119, which JTC records as $2,753.51 per square metre of gross floor area.
Can Buroh Connection units be strata-titled?
Yes. JTC allows strata subdivision of the Jalan Buroh site, so Buroh Connection can be offered as individual strata units, each with its own title under the 33-year lease.
What businesses can operate at Buroh Connection?
Business 2 is the zone for general industry. URA lists manufacturing, production, assembly, and repair and servicing among the predominant uses for B2, and each operator’s use is approved against URA’s rules and the conditions JTC set for the land.
Is GST payable on a Buroh Connection unit?
Yes. The sale of non-residential property by a GST-registered developer carries GST, currently 9%, on the purchase price. A GST-registered business buying for its own taxable operations may generally claim that GST back as input tax, subject to IRAS rules.
How much stamp duty applies to a Buroh Connection unit?
Buyer’s Stamp Duty on non-residential property runs from 1% on the first $180,000 to 5% on the portion above $1.5 million, and no Additional Buyer’s Stamp Duty applies. An industrial unit resold within three years of purchase attracts Seller’s Stamp Duty at 15%, 10% or 5%, depending on the year.
Can foreigners or companies buy a unit at Buroh Connection?
Yes. Industrial property sits outside the residential rules on foreign ownership, so individuals and companies, Singaporean or foreign, can buy a strata unit, and no Additional Buyer’s Stamp Duty applies. Many buyers purchase through a company, which banks often prefer for B2 units.
How close is Buroh Connection to Jurong Island and Jurong Port?
The Jurong Island Checkpoint lies about 590 m away and Jurong Port’s office on Jurong Port Road about 1.1 km away, which makes the site a short trip for suppliers and contractors serving either.
What is the project completion period for Buroh Connection?
JTC set a project completion period of 84 months from the award of the site on 17 July 2026, the window within which the development is to be built.
When will Buroh Connection floor plans and prices be released?
The e-brochure, floor plans, specifications and price list go to registered parties first, on the day each is issued. Registration is open now through the Sales Concierge on 6200 6220 or the form on this page.
How do I view the Buroh Connection showflat?
Showflat viewings are arranged by appointment through the Sales Concierge. Register through the form or call or WhatsApp 6200 6220, and an appointment is held in your name as soon as viewings open.
Make Buroh Connection Your Business Address
A Business 2 site on JTC land, a station at the corner and the port, island and expressway close by: Buroh Connection brings the working west of Singapore to one address.
Showflat viewings are arranged by appointment through the Sales Concierge. Call or WhatsApp 6200 6220, or register through the form.



